ON-SITE CONSTRUCTION CONTAINMENT SERVICE
We come to your jobsite and shrink wrap scaffolding, walls, openings, or full structures into a drum-tight enclosure — through wind, rain, snow, and dust. Same-week mobilization across Ottawa, Kingston, and the GTA, with full safety documentation for GCs.
Have an urgent request? Call us directly: +1 (343) 314-3420
17+ Years Experience
Pro-Grade Equipment
Safe. Fast. Reliable
Insured & Compliant
100% Guaranteed
Get Your Free Quote
Protect equipment, cargo, and freight on-site.
17+ Years Experience
Pro-Grade Equipment
Safe. Fast. Reliable
Insured & Compliant
100% Guaranteed
WHY SHRINK WRAP
Tarps and bungee-tied sheeting flap open in the first real wind, leak dust onto floors below, and peel off scaffold frames overnight. The foreman calls it in, the superintendent reschedules trades, and a windy week pushes the critical path.
Heat-shrunk film fits drum-tight to the scaffold or opening and stays sealed for the full job. Contains dust and debris in the work zone. Fire-retardant grade available for hot work zones. Zipper-door access points let crews move materials without cutting the cover. Film stock is recyclable.
SCAFFOLD ENCLOSURES
Masonry repointing, stone restoration, heritage exterior work. We wrap the full scaffold into a sealed enclosure — drum-tight, sealed at the parapet, anchored at grade. Heat the enclosure if the work needs it.
Drum-tight seal holds through high wind without flapping
White film gives shadow-free interior light for masonry work
Heatable enclosure extends the masonry season through winter
Fire-retardant grade for hot work permit zones

OUTDOOR STORAGE
Capital equipment often arrives months before installation is ready — HVAC units, conveyor sections, modular trailers, complete production lines. Sitting outdoors, exposed steel rusts, fan belts get chewed by mice, and the project budget pays for it later. We wrap each unit with vented, UV-stable film designed to hold up through Canadian winters and full seasons of weather.
Vented to prevent condensation and internal corrosion
UV-stabilized film for long-term outdoor exposure
Sealed against pests, dust, and water ingress
Removed cleanly when the equipment is ready for install


DUST & DEBRIS CONTAINMENT
Hospitals, schools, institutional facilities, tenant-active office towers. We wrap full-room partitions, ceiling-to-floor barriers, equipment enclosures, and access corridors. Dust stays in the work zone, the building stays running.
Floor-to-ceiling sealed barriers for occupied spaces
Opaque white film contains dust, debris, and paint overspray
Zipper-door access points keep the seal intact
Coordinates with abatement-adjacent and infection-control requirements
EMERGENCY WEATHER BARRIERS
Windows held at the border, replacement panels behind schedule, fire damage opened a structure. The site needs a cover that goes up today. We mobilize same-day and wrap openings or full sections into a sealed barrier that holds for weeks — not days.
Same-day mobilization across Eastern Ontario
Seals window openings, wall sections, and roof gaps
Holds through full storm exposure — no re-tying
Removes cleanly when permanent installation starts

WHY HEAT-SHRUNK VS. TARP
A tarp is rated for the moment it's installed. Heat-shrunk film is rated for the entire length of exposure — the way the cover behaves on day 1 is the way it behaves on day 90. Higher up-front, lower total cost.
INSURED & COMPLIANT
Every site we work on receives the documentation it needs. If your facility has a vendor portal, we complete it.
$5M General Liability Insurance
Full WSIB Coverage (Ontario)
Hot Work Permit Compliant
WHMIS Trained & Certified
Full WSIB Coverage (Ontario)
TRUSTED ACROSS ONTARIO INDUSTRY
TRUSTED ACROSS ONTARIO INDUSTRY
HOW IT WORKS
From first call to final walk-through.
01
This is a Paragraph Font
Send dimensions or pictures. We respond same-day with a written estimate.
02
Schedule
We confirm the date, send certificates if needed, and arrive with all gear.
03
On-site wrap
Most industrial wraps complete in a few hours. Larger jobs run 1–2 days.
04
Hand-off
Equipment is sealed, photographed, and ready for transport or storage. Final walk-through provided.
We shrink wrap industrial machinery, equipment, freight/cargo, tooling, construction materials, and specialty items. If it needs protection for shipping or outdoor storage, we can typically wrap it.
Yes. We come to your facility, yard, jobsite, or storage location with the tools and materials needed. This saves time and eliminates the need to transport equipment to a shop.
Yes. Industrial shrink wrap creates a tight, weather-resistant barrier that helps protect against rain, snow, road debris, dust, and contamination during transit. It’s commonly used for flatbed loads and oversized shipments.
Most projects can be completed the same day once scheduled, depending on size and complexity. We’ll confirm timing after we review the item dimensions, access, and site conditions.
Yes. Properly installed shrink wrap helps keep assets clean and dry for extended storage. Venting and correct installation techniques reduce moisture issues and help prevent damage over time.
Item type, approximate dimensions, location (city/site), timeline, and whether it’s for shipping or storage. Photos help a lot, especially for oversized equipment or irregular shapes.
Yes. We carry liability insurance and meet common jobsite safety requirements (WSIB compliance, WHMIS, Working at Heights, and hot-work/site rules where required), so vendors can be approved faster.
Tell us what you need protected — we’ll respond with a fast, no-obligation quote.
© Copyright 2026. Kingston, Canada. All rights reserved.